Water quality now consistently measures below 30 μS/cm, exceeding industry standards for coating applications. Energy consumption dropped to 0.85 kWh per cubic metre, cutting previous usage by 29% and delivering immediate cost savings.
Maintenance intervals were extended by 35%, reducing labour costs and improving system uptime. Modular design allows future capacity increases without significant infrastructure changes, protecting the client’s expansion investment.